ABC Inventory Analysis for Small Manufacturers, in Five Steps
ABC inventory analysis ranks stock by annual spend and sorts it into A, B and C items. Here are the five steps, a worked example, and the check small manufacturers need to add.

ABC inventory analysis ranks your stock by how much money flows through each item, then sorts it into three groups. A items are the few that carry most of the value. B items sit in the middle. C items are the many that carry very little.
The textbook version ranks purely by annual usage value. If you make things, that misses something. Rank your materials by what a stock-out would cost you in lost production runs, not only by annual spend, because a 30 cent label can stop a $4,000 batch.
Below: the five steps, a worked example with the arithmetic, the extra check that matters for manufacturers, and the point where the method stops being worth the effort.
What is ABC inventory analysis?
ABC inventory analysis ranks your stock by annual spend and sorts it into three groups, so you know which items deserve the most attention.
It rests on the Pareto principle: a small share of your items usually accounts for a large share of the money. You work out which items those are, call them A, and spend your counting time, buying care and supplier effort there first. Everything else gets lighter treatment.
Common cut-offs are roughly 80% of value for A, the next 15% for B, and the last 5% for C. Those are rules of thumb, not laws. Your own list decides where the lines fall.
How do you run an ABC inventory analysis in five steps?
You list every item, work out its annual usage, multiply by unit cost, sort from highest to lowest value, and draw your A, B and C lines.
- List every item you buy or hold. Raw materials, packaging and finished goods. One row per item, each in its own unit (kilograms, litres, each).
- Work out annual usage. How many units did you consume in the last 12 months? For a material, total it across every product it goes into, not just your best seller.
- Multiply by unit cost. Use what you’ve actually been paying lately, not a price from two years ago. That gives you annual usage value.
- Sort from highest to lowest. Add each item’s share of the total, then a running (cumulative) share down the list.
- Draw the lines. A is everything up to roughly 75 to 80% cumulative, B takes you to about 95%, and C is the rest.
A spreadsheet is plenty for this. The hard part is step 2, because usage is scattered across purchase orders and bills of materials.
Ranking ten skincare inputs, step by step
Take a small skincare manufacturer with ten purchased items. Here is its list after steps 1 to 4, sorted by annual value:
| Item | Annual use | Unit cost | Annual value | Share | Cumulative | Class |
|---|---|---|---|---|---|---|
| Glass jars | 12,000 | $0.45 | $5,400 | 23.2% | 23.2% | A |
| Pump bottles | 8,000 | $0.60 | $4,800 | 20.6% | 43.8% | A |
| Shea butter | 400 kg | $9.00 | $3,600 | 15.4% | 59.2% | A |
| Carrier oil blend | 300 L | $11.00 | $3,300 | 14.2% | 73.4% | A |
| Cartons | 20,000 | $0.12 | $2,400 | 10.3% | 83.7% | B |
| Fragrance oil | 40 L | $38.00 | $1,520 | 6.5% | 90.2% | B |
| Emulsifying wax | 120 kg | $7.00 | $840 | 3.6% | 93.8% | B |
| Printed labels | 20,000 | $0.03 | $600 | 2.6% | 96.4% | C |
| Preservative | 25 kg | $22.00 | $550 | 2.4% | 98.7% | C |
| Tamper bands | 20,000 | $0.015 | $300 | 1.3% | 100% | C |
Total annual spend is $23,310. I used 75% and 95% as the lines, because with only ten items an 80% line would pull cartons into A. Four items out of ten carry 73% of the spend. A real list of a few hundred lines tends to skew harder than this one.
By value alone, the three C items are the ones you’d count once a year and barely think about. That changes in the next section.
Why rank materials by stock-out cost too?
A cheap material can halt a whole production run, so annual spend alone hides the items most likely to hurt you.
Go back to the skincare list. Say a run makes 500 units that sell for $8 each, so $4,000 of product. The printed labels cost 3 cents each, which is $15 for the run. They’re a C item, 2.6% of spend.
Now say the label printer quotes three weeks for a reprint. You reach the labelling step, find an empty roll, and you’ve got 500 filled jars on a bench that can’t ship. Fifteen dollars of material is holding up $4,000 of product. By spend, labels are the least interesting thing on the list. By consequence, they’re near the top.
So add one column after step 5. For every item, ask:
- Does the run stop without it? If a missing item halts production, it’s a run-stopper.
- How long is the lead time? Three days to replace is different from three weeks.
- Is there a substitute you’ve already tested? A second jar supplier is a substitute. A custom-printed label usually isn’t.
In the example, labels and preservative are both C by value and both run-stoppers, with long lead times and no tested substitute. Tamper bands are C and a nuisance rather than a stopper. Same class, very different risk.
Where pure value ranking is right
The textbook method isn’t wrong. Ranking by annual usage value is the correct way to decide where your cash is tied up and where counting effort pays back. Nobody should count 3-cent bands as often as shea butter.
The stock-out lens goes on top of the value ranking, not in place of it. Value tells you what to count and how hard to negotiate. Consequence tells you what to never let run low.
Why apply it to raw materials and packaging, not just finished goods?
Finished goods tell you what sells, but a production run stops when any input is missing, so your materials and packaging need ranking as well.
Most ABC guides were written for retailers and distributors, where every item is something you resell. A small manufacturer buys inputs and turns them into products, and the same material often goes into several of them. Rank only your finished goods and you’ll never see that a $0.03 label sits in every product you make.
That’s why step 2 says to total usage across every bill of materials. A material that looks minor in any one product can be a big, shared dependency across the range. If you want a refresher on the inputs themselves, what raw materials are covers the basics, and manufacturing inventory management shows where materials sit in the wider picture.
What do you do with A, B and C items?
You give each group a different counting schedule, reorder rule and level of supplier attention, then override the class for run-stoppers.
The schedule below is a sensible starting point, not a standard. Adjust it to your own batch cadence.
| Group | Count | Reorder | Supplier |
|---|---|---|---|
| A | Monthly | Set a reorder point with safety stock, review it often | Quote regularly, negotiate terms |
| B | Quarterly | Set the reorder point once, review twice a year | Standard terms |
| C | Once or twice a year | Order in larger, less frequent lots | Fewest suppliers you can manage |
| Run-stopper, any class | Check before each run | Treat like an A item for reorder and safety stock | Look for a second source |
The last row matters. A run-stopper doesn’t need counting every month, because it’s cheap. It needs a reorder point that fires early and enough safety stock to cover its lead time. That’s a small cost for the item that can stop a $4,000 run.
Redo the ranking once or twice a year, and after anything big: a new product line, a supplier price jump, a new sales channel. Your A list will move. Your inventory turnover ratio is a useful companion check, since slow turnover in an A item is where tied-up cash hurts most.
When is ABC inventory analysis the wrong tool?
ABC inventory analysis is the wrong tool when you stock fewer than about 30 items or make mostly one-off custom work, because there’s no long tail to sort.
That 30 is a judgement, not a measured threshold. The reasoning: with a short list you already know which items matter, and a ranking will confirm what you can see. The time is better spent on a reorder point for each item.
One-off custom work breaks the method for a different reason. ABC analysis assumes usage you can measure over a year and expect to repeat. If every job uses different materials, last year’s usage doesn’t predict much, so rank by lead time and consequence instead.
Frequently Asked Questions
What do A, B and C mean in ABC inventory analysis?
A items are the few that carry most of your annual spend, often around 75 to 80%. B items carry the next slice, up to roughly 95%. C items are the long tail of low-value lines. Each group gets a different counting schedule and reorder rule, so your attention goes where the money is.
How do I do an ABC inventory analysis in a spreadsheet?
List each item with its annual usage and unit cost, then add a column that multiplies the two. Sort that column from highest to lowest, add a running percentage of the total, and mark A, B and C where the running percentage crosses your cut-offs. One sheet and about an hour covers a few hundred items.
Does ABC inventory analysis work for raw materials?
Yes, and it matters more there for a manufacturer, because a missing input stops a run. Total each material's usage across every bill of materials. Keeping materials and bills of materials in one place, as Stocksmith is built for, makes that usage one number rather than a sum across several sheets.
How often should I redo my ABC analysis?
Once or twice a year suits most small manufacturers, plus a rerun after a big change such as a new product line, a sharp supplier price rise or a new sales channel. Usage and prices shift, so an item that was B last year can become A. A stale ranking sends your counting effort to the wrong shelf.
Is ABC inventory analysis worth it with a small number of items?
Usually not below about 30 items. That figure is a judgement, not a rule. With a short list you can already see which items matter, so a ranking adds little. Spend the hour setting a reorder point for each item instead, and rank by lead time and stock-out cost if one missing part would stop you.
Your next step
Pull the last 12 months of purchases and build the ranked list. It’s an hour of work, and it will show you your A items.
Then add the column most guides skip. Next to every C item, write down whether the run stops without it and how long the lead time is. The few that stop a run are the ones to protect first, whatever they cost. A ranking by spend tells you where your money is. This one tells you what can stop a production run.